Hi everyone! We're hard at work trying to keep our community clean, so if you see any spam, please report it here and we'll review ASAP! Thanks a million!
LONDON UNDERGROUND OR THE TUBE LONDON UNDERGROUND OR THE TUBE - NEW TRAINS, AUTOMATIC DOORS, FAST, AIR CONDITIONED Flag This WallpaperAdd to FavoritesEnlarge Wallpaper Wallpaper Description: The London Underground 2024 Stock, known as the New Tube for London (NTfL) during development, is a London Underground train being built by Siemens Mobility at its facilities in Goole, United Kingdom and Vienna, Austria. It is part of the Siemens Inspiro family of metro and rapid-transport trains.
An initial batch of 94 nine-car trains has been ordered at a cost of GBP 1.5 billion to replace 1973 Stock trains on the Piccadilly line, with options for a total of 250 trains allowing replacement of all existing trains on the deep-level Central, Waterloo & City and Bakerloo lines. Planned starting date for the service is 2025, firstly on the Piccadilly line. The trains will enter service with a train driver, with future potential for driverless operation
JOHNBECK
Uploaded by JOHNBECK on
.
LONDON UNDERGROUND OR THE TUBE - Desktop Nexus PeopleDownload free wallpapers and background images: LONDON UNDERGROUND OR THE TUBE. Desktop Nexus People background ID 2727335. LONDON UNDERGROUND OR THE TUBE LONDON UNDERGROUND OR THE TUBE - NEW TRAINS, AUTOMATIC DOORS, FAST, AIR CONDITIONED Flag This WallpaperAdd to FavoritesEnlarge Wallpaper Wallpaper Description: The London Underground 2024 Stock, known as the New Tube for London (NTfL) during development, is a London Underground train being built by Siemens Mobility at its facilities in Goole, United Kingdom and Vienna, Austria. It is part of the Siemens Inspiro family of metro and rapid-transport trains.
An initial batch of 94 nine-car trains has been ordered at a cost of GBP 1.5 billion to replace 1973 Stock trains on the Piccadilly line, with options for a total of 250 trains allowing replacement of all existing trains on the deep-level Central, Waterloo & City and Bakerloo lines. Planned starting date for the service is 2025, firstly on the Piccadilly line. The trains will enter service with a train driver, with future potential for driverless operation
Rating: 4.1
Total Downloads: 9
Times Favorited: 2
Uploaded By: JOHNBECK
Date Uploaded: February 20, 2024
Filename: NDERGROUND-exterior.jpg
Original Resolution: 1366x808
File Size: 167.7KB
Category: Other